70tons Double Girder Foundry Crane for the smelting of iron and steel

Product Details:
Place of Origin: Henan, China (Mainland)
Brand Name: KUANGYUAN
Certification: CE GOST ISO
Model Number: QDY
Payment & Shipping Terms:
Minimum Order Quantity: 1pic
Price: Negotiation
Packaging Details: Standard export package.
Delivery Time: 60days
Payment Terms: T/T, L/C
Supply Ability: 2000 per/year

Detail Information

Lifting Capacity: 70t Span: 10.5-31.5m
Control Method: Cabin Or Remote Working Duty: A7-A8
Color: Customized Color Acceptable Product Name: 70tons Double Girder Foundry Crane For The Smelting Of Iron And Steel
Electrical Equipment: Schneider Lifting Equipment: Hook Or Gantry Hook
Steel Track Recommended: 43kg/m Or QU70 Max. Wheel Load: 76-537KN
High Light:

electric overhead travelling crane

,

port material handling equipment

Product Description

70tons Double Girder Foundry Crane for the smelting of iron and steel

 
1. Product Description for Warehouse high quality QDY double girder ladle crane price 

70tons double girder foundry crane  is composed of boxed bridge frame, hook, crane travelling mechanism and electric system. The main hook employs a load tool as the lifting device to hoist steel ladle, the auxiliary hook cooperate with the main hook to accomplish pouring of molten steel and steel slag, and other auxiliary hoisting.Use various speed system with speed ratio as 1:10 for main mechanisms such as hoisting, trolley traversing and crane travelling. Also we can choose the suitable speed under the customer requirement.

 


Product Detail for 70tons Double Girder Foundry Crane for the smelting of iron and steel

 

70tons Double Girder Foundry Crane  for the smelting of iron and steel 0
 

QDY .jpg

 

 

Main Features for 70tons Double Girder Foundry Crane for the smelting of iron and steel

Working condition for Warehouse high quality QDY double girder ladle crane price

1. Working tempreture:-10~+60°C,
2. Work class:A6-A8,
3. Power Source:3ph,380V,50HZ or other under customer requirement.

Safety feature for 70tons Double Girder Foundry Crane for the smelting of iron and steel

1. Weight overload protection device,
2. Top quality long time bearing polyurethane materials buffer,
3. Crane traveling limit switch, Voltage lower protection function,
4. Emergency stop system,
5. Current overload protection system and so on!

 

Product Structure for 70tons Double Girder Foundry Crane for the smelting of iron and steel

 

Lifting weight Primary handcart T 100
Secondary handccart 30
Span   16
Lifting height Primary handcart M 18
Secondary handccart 19
Working class A6
Speed Lift Primary handcart m/min 7.54
Secondary handccart 8.93
Travel Primary handcart   35.08
Secondary handccart 42.44
Motor Lift Primary handcart Type/kw YZR355M-10/90×2
Secondary handccart YZR280M-10/55
Travel Primary handcart YZR160L-8/9×2
Secondary handccart YZR160M1-6/6.3
Cart YZR225M-8/22×4
Weight Primary handcart T 66
Secondary handcart 10.25
Cart 173
Max wheel pressure KN 520
Steel track   QU120
Power supply   3-phase A.C. 50Hz 380V

Design and Development:

We strongly believe in Design and Development for the improvement of the products to save power and money. We have a wonderful team for Quality Assurance and set to achieve higher goals and conquer new horizons.

 

Ralited details

 

QZ

 

 

 

Customer Visit

.jpg

FAQ

 

--2_07.jpg

 

 

Get in touch with us

Enter Your Message

You Might Be Into These